Case Studies

Real projects, real results

Defense Client Component Database

A leading defense contractor

Challenge

A leading defense contractor needed a comprehensive component database for long-term projects with zero tolerance for errors. The client was struggling with fragmented supplier information, inconsistent component specifications, and lack of visibility into long-term availability risks.

Our Approach

We started with a complete audit of their existing component library and supplier relationships. Our team worked closely with their engineering and procurement teams to understand technical requirements, compliance needs, and project timelines.

Solution

We built a custom component management system with detailed specifications, compliance tracking, and multi-source verification. The system included: standardized component data templates, supplier qualification database, long-term availability tracking, risk assessment framework, and automated alerts for end-of-life notifications.

Results

  • ✓The project was delivered on time, meeting all compliance requirements
  • ✓The client gained a reliable, scalable component management system
  • ✓Reduced component sourcing time by 60% for future projects
  • ✓Established long-term supplier relationships with verified quality

Hardware Startup BOM Optimization

IoT hardware startup

Challenge

A hardware startup was facing 40% higher BOM costs than expected, threatening their product viability and runway. They had designed a sophisticated IoT device but lacked experience in component sourcing and supplier negotiation.

Our Approach

We conducted a line-by-line BOM analysis, categorizing components by cost impact, availability risk, and substitution feasibility. Our team leveraged our supplier network to identify alternatives and negotiate better terms.

Solution

We identified alternative components with equivalent specifications at lower cost points, consolidated suppliers to improve negotiating leverage, and redesigned the procurement strategy to balance cost, availability, and lead times. Key changes included: MCU alternative with 25% cost reduction, passive component consolidation reducing SKU count by 30%, connector standardization improving pricing tiers.

Results

  • ✓Reduced BOM costs by 32% while maintaining performance standards
  • ✓Enabled successful product launch within budget constraints
  • ✓Established framework for ongoing cost optimization
  • ✓Extended company runway by 6 months through cost savings

Have a similar challenge?

We can help you achieve similar results for your hardware project.

Start Your Project